Fishery Improvement
Projects

A Fishery Improvement Project is a multi-stakeholder initiative that aims to help fisheries work towards sustainability.

Fishery Improvement Projects within Project UK

Project UK includes 12 fisheries, through eight FIPs. These fisheries were selected by the supply chain because they bring commercial, economic, and cultural benefits to UK communities. As part of Project UK, these FIPs address 61 individual actions.

These actions address multiple milestones across a five-year period, representing best practice in working towards an environmentally sustainable future.

Catch up on the FIPs progress via our Annual Reports

 
Waves_Yellow.png
ICES Areas Covered by Project UK

ICES Areas Covered by Project UK

 
 
Untitled design (67).png

Credible FIPs

To meet the MSC definition of a credible Fishery Improvement Project,
the FIP must:

  • Conduct an initial gap analysis against the MSC Standard (MSC pre-assessment).

  • Produce an Action Plan inclusive of activities, budgets, roles and responsibilities, that is linked to the MSC performance indicators and scoring guideposts and is ultimately capable of delivering an unconditional pass against the MSC Standard.

  • Regularly report progress against the Action Plan.

  • Have a mechanism to verify and provide assurance about the robustness of the process and progress being made in the FIP (i.e. pre-assessment and progress reports prepared or reviewed by an MSC assessor or an independent technical consultant).

  • Have a pre-determined limit to the amount of time spent as a FIP, which should generally be no longer than five years.

  • Aim to reach a level where the fishery could choose to enter full MSC assessment and achieve MSC certification through a transparent, third-party process, to verify the success of the FIP.

 

Steering Group members are already enquiring about the next round of fisheries to be included in the project, and the Secretariat welcomes suggestions with regards to new species that might be considered as candidates.

Star Burst_Dark Grey.png
 
 
 
 
 

Project UK’s FIPs are divided into two rounds, based on the year that they were launched.

Waves_Multi.png
 

Round 1

The first round of FIPs to participate in Project UK (Channel scallop, monkfish, plaice & lemon sole, and crab & lobster) were launched in 2017.

So far, these fisheries have made demonstrable progress against their Action Plans, focusing on developing and documenting robust stock management and mitigating environmental impacts.

In 2022, the funders and Steering Group members reviewed the impacts of Brexit and the global pandemic on the progress of the FIP actions. They agreed to a timebound extension of these FIPs to ensure that all identified actions impacted by these unforeseen events have the time and attention required to complete them. Updated action plans can be found on each FIP page, and more information on the extension can be found here.

 

Round 2

Following the success of Round 1, the UK scallop and Nephrops FIPs were launched in 2019.

Each includes three fishery areas around the UK (North Sea, West of Scotland, and Irish Sea), and so operate on a larger scale than Round 1 FIPs.

Irregular Dots_Yellow.png
 
 
Untitled design (12).png

All Project UK FIPs have Action Plans that are based around the requirements of the MSC Fishery Standard.

Steering Group members provide information and expertise and are essential to defining and delivering each Action Plan – which outlines a series of steps for fishery improvements. 

Actions are all listed and updated on fisheryprogress.org, ensuring that the work is transparent and that Steering Groups are held accountable for maintaining progress.

All documents, including pre-assessments, Action Plans, minutes and annual reviews, are available to view on the individual FIP pages on this website.

 
 
 
 
 
 
 

Pathway to Project UK

The FIPs run for a pre-determined timeline set by the Steering Group, based on the draft Action Plan and benchmarking and tracking tool, generally up to a maximum of five years. This timeline begins with a formal agreement of the Action Plan by the relevant Steering Group.

 
 

MSC Fisheries Standard

The MSC Fisheries Standard is used to assess whether a fishery is well-managed and sustainable. Fisheries are assessed by accredited independent certifiers called Conformity Assessment Bodies (CABs). The MSC Fisheries Standard has three core principles that every fishery must meet.

 

Principle 1

Sustainable Fish
Stocks

Fishing must be at a level that ensures it can continue indefinitely and the fish population can remain productive and healthy.

Principle 2

Minimising Environmental Impact

Fishing activity must be managed carefully so that other species and habitats within the ecosystem remain healthy.

Principle 3

Effective Fisheries Management

MSC certified fisheries must comply with relevant laws and be able to adapt to changing environmental circumstances.

 
image002.png
 

There are 28 performance indicators that sit under the three principles of the MSC Fisheries Standard.

A fishery is assigned a score for each performance indicator, where 60 is the minimum acceptable performance, 80 is global best practice and 100 is state of the art performance.

The Project UK FIPs are aiming to meet SG80 at the end of their five-year timeline. 

 

Photos by ©South Devon & Channel Fishermen (Images 1, 2 & 4) Macduff Shellfish (Image 3) and ©Nina Constable (Images 5 & 6)